Jettyless LNG
Applications

LNG Export

Demand for LNG trading has increased dramatically over the last decade. From 2009 to 2018, there have been 184 more trading routes and an additional 20 importing countries; this means populations are demanding more energy and customer diversity is increasing.

The largest exporters globally are Qatar, Australia, USA, Russia and Malaysia, accounting for more than half of the world’s export in 2019. LNG export from developing countries paves the way for a stronger local economy and sustainable development.

Discuss your export project
UTS - Attachment system
UTS - top view
UTS - top view
UTS - Connect to any vessel

IQuay™ Technical Highlights

The IQuay enables transfer of between a vessel and storage facilities and is fully qualified by DNV GL.

Distance from shore
50 - 800 m

Environment
Sheltered to harsh conditions

Flowrate
100 - 2,500 m3/h

Transfer lines
Floating cryogenic hoses

Carrier vessel size
1,000 - 266,000 m3

Design life
25 years

We have leveraged on the Standard IQuay qualified design to develop solutions for large scale import and export between ship & shore.

Distance from shore
50 - 800 m

Environment
Sheltered to harsh conditions

Flowrate
2,500 - 12,000 m3/h

Transfer lines
Floating cryogenic hoses

LNGC Size
Up to 266,000 m3

Design life
25 years

UTS - Offloading

Roughly 10-20hrs for loading and discharge

    • Process system will be sized according to the flow rate requirements of the client.
    • The time frame for loading and discharge is roughly 15-25 hrs depending on large or small-scale application.
    UTS - Ballast system

    Fully redundant ballast system

      • The ballast system enables the unit to follow the carrier vessel vertically during loading and unloading.
      • Remotely operated by the operator onshore.
      • 100% redundancy ensures that any single failure event does not delay the operation.
      UTS - Wave height

      Operational in significant wave height of 2 meters

        • The platform is optimised for minimum wave response, with extensive numerical and experimental modelling and research.
        • The vacuum attachment system further reduces motions when attached to the carrier vessel.
        UTS - Umbilical

        Power and signals via umbilical

          • A robust flexible floating umbilical provides power, signals and communication to the IQuay platform.
          • The umbilical runs parallel to the floating hoses, and can be reeled.
          • The IQuay platform is equipped with a UPS, which will keep critical systems live in case of loss of power from shore.
          UTS - Minimum boil-off gas

          Minimum boil-off gas generation

            • Due to the superior insulation properties of the floating hoses, the boil off generation throughout the system is minimal.
            • Rigid piping and valves on the platform are also insulated to further reduce heat inleak.
            UTS - Safety

            Focus on Safety

              • The platform is equipped with an industry standard ship-shore-link system, which interlinks the ESD systems of the carrier vessel, the IQuay platform, and the terminal.
              • Fire, smoke and gas detectors are located throughout the unit, which will instantly trigger ESD and shut down process flow.
              Talk to us about your project

              Learn more about Jettyless Transfer

              A selection of our customers and industry partners

              Jettyless LNG world map

              We are dedicated to realising and
              de-risking your marine infrastructure project

              ECOnnect Energy was born from first-hand experience with the challenges and inefficiencies of traditional LNG offloading methods from ship to shore. Our core offerings remove the need for fixed and permanent infrastructure such as quays, jetties, trestle structures and loading platforms.

              Dredging, which is expensive and damaging to coastal areas, can be eliminated with ECOnnect’s floating jettyless transfer solution.

              The road to your Jettyless infrastructure project

              Contact us! Share information about your application and operational requirements, irrespective of project maturity.

              1

              Our domain experts will evaluate your project parameters to ensure that jettyless is a viable and optimal solution.

              2

              Gain access to our domain experts and
              work with us
              to further mature the project definition.

              3

              Realise your infrastructure project by reducing; investment, execution schedules, and environmental impact.

              4
              1

              Share information with us about your project (confidential).

              2

              Our domain experts will evaluate your project parameters to ensure Jettyless is a viable and optimal solution.

              3

              Work with us to further mature the project definition and gain access to our marine and process experts.

              4

              Realise your infrastructure project by cutting costs and project plans.

              Let's talk about your project

              Our team will get in touch with you shortly.